Renovation | Floor -1

In December 2022, we started renovating our facilities on the -1 floor. First of all, the toilets were completely renovated. The wallpaper was given a makeover in Van der Valk's signature style. The sinks and taps were replaced and a new dressing table was added to the women's toilet.


The old kids' club made way for a floatation room. In this soothing room, you can float weightlessly without stimuli in a magnesium bath. Floating is equivalent to five hours of sleep, making it the perfect way to completely unwind.


In addition, the old office spaces at -1 were converted into an arcade space and a new kids' club. In the arcade room, you can challenge your company to a game of pool. Next to the arcade room, the new kids' club was built. Here, children can join a game of table tennis, let loose in the ball pit, play air hockey or have fun in the indoor climbing frame.